Installation

Our pools are delivered on a low loader transporter and the driver can detach the trailer from the front cab to carry the pool a short distance to enable better access to the site.

During manufacture, steel reinforcing bars and perimeter buttressing are encased within the shell to ensure maximum strength. If the ground is not quite ready for the pool on delivery, then it can be set down in an appropriate holding place and lowered in at a later stage using your digging equipment. Steel lifting strops are fibre glassed into both sides of the pool to enable it to be carried and lowered into the ground.

Full installation instructions will be provided as well as telephone technical support if needed.

You may be looking to install the pool yourself, or to employ a builder or garden landscaper. Installing a fibreglass pool is straightforward and follows these basic steps:

 
gallery-1.png
 
 

The Dig

We’ll provide you with the dig measurements specific to the pool size you have chosen.

Ground preparation

Lay a pea shingle base and level.

Pool

Lower the pool into the hole and check levels Pipework Connect pipes to the factory fitted inlets/outlets and run back to the plant room.

The fill

Backfill the surrounding trench with pea shingle whilst filling the pool with water.

Finish

Lay a concrete ring beam around the top as a base for your coping/ flooring.

Plantroom

Pipe up your filtration equipment

Reach for your costume!

Looking to make a splash this summer? Why not arrange a free consultation.

Looking to make a splash this summer? Why not arrange a free consultation.